harness - The Modern Software Delivery Platform®
Create
Log in
Feedback
Feature Requests
Log in to your harness - The Modern Software Delivery Platform® account to give feedback
Log In
Boards
Feature Requests
Powered by Canny
Feature Requests
Anonymous
Feature Requests for Harness. Select 'Category' based on the module you are requesting the feature for.
Details
Category
Select a category
Showing
Trending
Sort
Trending
Top
New
Filter
Under Review
Planned
In Progress
This Fiscal Quarter
Next Fiscal Quarter
Long-term
Pending Feedback
Complete
posts in
All Categories
All Categories
Continuous Delivery & GitOps (1,946)
Continuous Integration (427)
Feature Mgmt & Experimentation (324)
Cloud Cost Management (232)
Feature Flags (115)
Service Reliability Management (11)
Security Testing Orchestration (120)
Chaos Engineering (40)
Software Engineering Insights (127)
General Platform Requests (521)
Internal Developer Portal (147)
Code Repository (54)
IACM (43)
Continuous Error Tracking (13)
Drone 2.x (13)
Open Source (32)
SSCA (21)
Database DevOps (18)
Application and API Posture (0)
Application and API Security (4)
Application and API Protection (1)
Traceable Platform (0)
Artifact Registry (14)
Forecast Costs in Perspective should forecast to end of date range selected
For the 'Forecast Cost' value inside of a Perspective is meaningless. It currently always shows the next 30 days, which is useless when trying to forecast costs for a Single month or For a quarter. What should happen is the Forecast value should respect the Data Range and the Period filters. If you are selecting "This month" and "Daily" it should forecast to the end of "this month". Details: * when Selecting show "this month" the 'forecast cost' value should forecast to the end of "this month". * when selecting show "this year" it should show the forecasted value for the remainder of "this year"
3
·
Cloud Cost Management
·
in progress
3
anomalies does not identify false positives
anomalies do not decrease when marked as a false positive, only a message appears but leaves the anomaly in the same list
6
·
Cloud Cost Management
·
in progress
6
Perspective scheduled report enhancement
When setting the report on a quarterly frequency. Currently, only the last month's cost can be provided in the report. This doesn't match the frequency and period needed. UKRI would like to be able to use custom dates such as last 3 months or custom period
6
·
Cloud Cost Management
·
in progress
1
Ability to Snooze CCM Recommendations
Currently you can add CCM Recommendations to the "Ignore List". Requesting the ability to "Snooze" CCM Recommendations. Thus ignoring them for a period of time.
3
·
Cloud Cost Management
·
in progress
1
Alerting when Autostopping fails to start an instance
We need some sort of alerting outside of Harness when an autostopping rule fails to restart an instance as scheduled. Harness shows logs when an instance fails to restart, but we need an alert to bring attention to it
4
·
Cloud Cost Management
·
in progress
7
Encoded links does not work in Schedule Delivery of Dashboards
Encoded links do not work in Schedule Delivery --> Advanced Options, even after enabling the checkbox Include links
2
·
Cloud Cost Management
·
in progress
1
Clone of read only perspective
Currently the clone of Read only perspective is not possible. So users can't create a clone and modify the visualisation according to their need.
4
·
Cloud Cost Management
·
in progress
1
Feature Flags
I've been told that Harness does not have a collective list of feature flags available in the CCM tool. As they are spread across functionality they add them to release docs and corresponding detail section of the documentation. Can a list please be provided with links to these release notes and other relevant descriptors of the flags purpose and function? We are missing out on things we don't know exist and may have just resigned ourselves to not having.
3
·
Cloud Cost Management
·
in progress
1
In Progress Status for Recommendation
Allow a recommendation to remain as listed once it has been put into a new "In Progress Status". This gives the engineer a chance to return to the tool to register the action taken and provide a fair estimation of the actual savings gained. Sometimes it takes a few weeks before the savings can be seen in enough data to prove the value of the actioned recommendation. A5t the moment the Engineer only has until the next update, when the recommendation may just disappear! Mad!
6
·
Cloud Cost Management
·
in progress
4
Jira Ticket updated not accepted to move Recommendation status to Accepted
It appears that the parameters by which Harness moves their Recommendations to "accepted" status is too rigid. It doesn't appear to be observing the ticket's resolution field, and is looking at the status, so anything outside of the actual "Done" status won't be accepted We'd like Harness to either allow us to customize the acceptance criteria, or broaden the range.
3
·
Cloud Cost Management
·
in progress
2
Load More
→
Powered by Canny